Cost
In this section we have laid out both the parts list, the part sources, and the cost of all the components needed to build a lineman. In the parts list there are two cost tallied at the bottom. The first is the cost of building a lineman from scratch with no materials. The prorated cost is the cost when factoring in how much of each order of material is used in a single lineman.
Click here to open a pdf showing our most updated parts list.